Many customers are actually surprised at the process and the labor of installation. The process is as follows: design, property surveyed for underground utility lines by the utility companies (a free service), trenches are dug, boring under a driveway or sidewalk if one has to be crossed, pipe laid in trenches, a pipe connected to control valves which involves electrical wiring, the wiring run underground to the control box, and then finally the pipe and trenches are covered. The process usually takes two to three days, weather permitting.